"Copper Heap Leach - From Permits To Cathodes"

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 629 KB
- Publication Date:
- Jan 1, 1993
Abstract
Magma Copper Company's San Manuel SX-EW facility has operated since May, 1986. The original facility had a design capacity of 25,000 tons per year of electrowon copper cathode produced by processing pregnant leach solution from an open pit/heap leach operation. In 1988, the plant was expanded to 50,000 tons per year to incorporate processing in-situ leach solutions. This paper focuses primarily on the heap leaching area with regard to exploration, testing, feasibility, permitting, design and construction, and operating practices. Research utilizing surfactant leaching aids to enhance copper recovery is also discussed.
Citation
APA:
(1993) "Copper Heap Leach - From Permits To Cathodes"MLA: "Copper Heap Leach - From Permits To Cathodes". Society for Mining, Metallurgy & Exploration, 1993.