An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall of the combined pit. Their mining plan included the development of a new ramp into the quarry pit in order to lessen the slope and to shorten haul truck cycle time. The task would be to remove a section of rock left behind from mining operations more than 20 years ago that was at or near the bottom of the designed ramp.
Citation
APA:
(2012) Moving 50’(15.3m) of Burden with a 4½” (115mm) HoleMLA: Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole. International Society of Explosives Engineers, 2012.