130 M Deep Bored Piles – A New Superlative

Deep Foundations Institute
Karsten Beckhans Vijay Kumar Serhat Baycan
Organization:
Deep Foundations Institute
Pages:
11
File Size:
4090 KB
Publication Date:
Nov 1, 2022

Abstract

For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the depth requirement of the design, for planning purposes and preparation for site, the drilling equipment was required to achieve a maximum drilling depth of 150 m. Actual piles constructed on site were deeper than 120 m. These dimensions caused superlative challenges which included but were not limited to; controlling the open hole stability over time with polymer, installing 70-ton heavy steel cages, pouring up to 550 m³ concrete continuously, in conjunction with installation of kingposts into workable, fresh concrete. The piling works were executed with a BG 72, the biggest drilling rig globally available, and the stringent verticality of the pile bore holes which required approval prior to cage installation. For verification of verticality, Bauer’s patented Drilling Inclination System was successfully used.
Citation

APA: Karsten Beckhans Vijay Kumar Serhat Baycan  (2022)  130 M Deep Bored Piles – A New Superlative

MLA: Karsten Beckhans Vijay Kumar Serhat Baycan 130 M Deep Bored Piles – A New Superlative. Deep Foundations Institute, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account