180 kA Booster Cells Operation at Albras

Canadian Institute of Mining, Metallurgy and Petroleum
G. E. da Mota J. E. M. Blasques H. P. Dias G. De Gregoriis
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
13
File Size:
787 KB
Publication Date:
Jan 1, 2006

Abstract

In recent years, like many other smelters around the world, Albras has been increasing line current. The necessary adjustments to the work practices and process variables need to be made on all potlines, which in this case means on 960 cells at the same time. It was a challenging task to adjust the process parameters to the new amperage. In July 2003 potlines 2, 3 and 4 were running at 1 73 kA and the goal at that time was to reach 180 kA. Preliminary trials with 180 kA were performed on a group of 10 boosted cells on potline 3 in order to investigate possible operational problems. It was decided to increase the amperage in three steps accompanied by continual evaluation of the state of the process. In July 2004 the target of 180 kA was achieved with good operational results. This paper presents the overall results, the parameter adjustments made during the amperage increase in the booster group and how the increase was implemented on the other potlines.
Citation

APA: G. E. da Mota J. E. M. Blasques H. P. Dias G. De Gregoriis  (2006)  180 kA Booster Cells Operation at Albras

MLA: G. E. da Mota J. E. M. Blasques H. P. Dias G. De Gregoriis 180 kA Booster Cells Operation at Albras. Canadian Institute of Mining, Metallurgy and Petroleum, 2006.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account