180 kA Booster Cells Operation at Albras

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 13
- File Size:
- 787 KB
- Publication Date:
- Jan 1, 2006
Abstract
In recent years, like many other smelters around the world, Albras has been increasing line current. The necessary adjustments to the work practices and process variables need to be made on all potlines, which in this case means on 960 cells at the same time. It was a challenging task to adjust the process parameters to the new amperage. In July 2003 potlines 2, 3 and 4 were running at 1 73 kA and the goal at that time was to reach 180 kA. Preliminary trials with 180 kA were performed on a group of 10 boosted cells on potline 3 in order to investigate possible operational problems. It was decided to increase the amperage in three steps accompanied by continual evaluation of the state of the process. In July 2004 the target of 180 kA was achieved with good operational results. This paper presents the overall results, the parameter adjustments made during the amperage increase in the booster group and how the increase was implemented on the other potlines.
Citation
APA:
(2006) 180 kA Booster Cells Operation at AlbrasMLA: 180 kA Booster Cells Operation at Albras. Canadian Institute of Mining, Metallurgy and Petroleum, 2006.