2. Preliminary Economic Evaluation of Coal Mine Feasibility ? Introduction

Society for Mining, Metallurgy & Exploration
George W. Toth
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
15
File Size:
572 KB
Publication Date:
Jan 1, 1979

Abstract

This chapter describes the development of a computer code which rapidly estimates the cost of producing coal from either surface or underground mining situations. The computer code, termed the coal production cost (CPC) code, was developed under an NUS corporate research grant and was based on the findings of several coal mining and cost research analyses performed by NUS over a three-year period. The studies which served as the primary basis for the CPC code were the coal mining cost models developed by NUS for the Electric Power Research Institute. These models were designed for use in manual analyses and have been published by EPRI (Toth, 1977; and Stinnett, 1977).
Citation

APA: George W. Toth  (1979)  2. Preliminary Economic Evaluation of Coal Mine Feasibility ? Introduction

MLA: George W. Toth 2. Preliminary Economic Evaluation of Coal Mine Feasibility ? Introduction. Society for Mining, Metallurgy & Exploration, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account