Abstract
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with
Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline
tunnel in Redwood City, CA. Owner and Design-Builder teamed with designer Arup to
provide a final product: 3.3 miles of 182 in. O.D. precast concrete segmentally lined
tunnel with 10 ft. and 11 ft. I.D. Fiberglass Reinforced Polymer Mortar (FRPM) carrier
pipe, complete with two FRPM Drop Structures. BBJV and Arup collaborated with
SVCW to evaluate alternative design concepts, negotiate an agreeable price and
reduce contingencies through a transparent estimating process, and deliver the project
ahead of schedule.
Citation
APA:
(2023) A Case Study in Successful Progressive Design Build Tunneling - RETC2023MLA: A Case Study in Successful Progressive Design Build Tunneling - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.