A Two-Step Model to Optimize the seMI-Mobile In-Pit Crusher Locations and the Mine Schedule

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 19
- File Size:
- 1238 KB
- Publication Date:
- Jun 25, 2023
Abstract
In-pit crushing and conveying (IPCC) is an option to decrease the enormous operating costs that a truck shovel can introduce in an open-pit mine. Finding the best locations for the IPCC over the mine life will impose a new set of requirements for the mine planning. Through a two-step mathematical programming model alongside the road network, this method finds the optimal in-pit crusher locations and relocation times first and then optimizes the long-term mine schedule. The model is verified by a real mine. The results show that the truck travel time could be reduced by 500% and the discounted cash flow increased by 8% with an optimized schedule considering the crusher placement.
Citation
APA:
(2023) A Two-Step Model to Optimize the seMI-Mobile In-Pit Crusher Locations and the Mine ScheduleMLA: A Two-Step Model to Optimize the seMI-Mobile In-Pit Crusher Locations and the Mine Schedule. Society for Mining, Metallurgy & Exploration, 2023.