Accelerated Rehabilitation of the White Rock Tunnel - RECT2021

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 3998 KB
- Publication Date:
- Jun 13, 2021
Abstract
When unwatered after more than 50 years of operation, the White Rock Tunnel of the Upper American River Project in the foothills of the Sierra Mountains exhibited failing rockbolts and ground falls. Repairs designed for the 5 mile-long, 24-foot horseshoe unlined hydropower tunnel included pattern rock bolts, shotcrete, and cleanout of the rock trap. The work, originally scheduled for two 3-month winter outages, was completed under challenging conditions in a single 4-month outage following a carefully sequenced work plan using robotic shotcrete and rockbolter machines. Flexibility, creative solutions, and collaboration by all parties were key to project success.
Citation
APA:
(2021) Accelerated Rehabilitation of the White Rock Tunnel - RECT2021MLA: Accelerated Rehabilitation of the White Rock Tunnel - RECT2021. Society for Mining, Metallurgy & Exploration, 2021.