Abstract

The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for improved system availability and efficiency. The WIPP, located near Carlsbad, New Mexico, is a U.S. Department of Energy (DOE) Carlsbad Area Office facility designed to permanently dispose of U.S. defense-generated transuranic waste in a deep bedded salt deposit. Engineers at the WIPP performed a feasibility analysis for either modifying, supplementing, or replacing its two main mine fans. Since the centrifugal fans were installed in 1988, multiple operational and performance concerns have been identified. A comprehensive engineering study was conducted (McDaniel, et al., 1997) to: identify and quantify operational concerns, evaluate possible alternatives, and recommend an optimum solution. The study indicated that adding a third single-duty centrifugal fan similar to the two existing fans, and equipping that fan with Inlet Van Controls (IVCs) was the best choice. This alternative provided the most desirable combination of operational readiness, and improving system performance. The fan installation project accommodates several operational and scheduling constraints. WIPP is scheduled to receive waste in May 1998. This milestone is proceeded by an operational readiness review. Fan installation could not be allowed to compromise the WIPP's ability to declare facility readiness and had to minimize operational disruptions during the system tie-in. All engineering for the project is completed and physical modifications started in July 1997. The project was completed in 1998.
Citation

APA: K. H. McDaniel L. Griswold  (1999)  Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

MLA: K. H. McDaniel L. Griswold Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado). Society for Mining, Metallurgy & Exploration, 1999.