An Analysis of a Detailed Engineering Study in Accordance with IESO IAP Requirements

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 7
- File Size:
- 236 KB
- Publication Date:
- Jan 1, 2019
Abstract
"An Independent Electricity System Operator Industrial Accelerator Program (IESO IAP) case study was completed for a mine in Ontario, Canada by SRK Consulting, Inc. The purpose of the study was to analyze the ventilation system to determine whether and which system improvements could reduce the overall electrical power demand of the mine. Financial incentives are offered by the IESO IAP grant program to help cover the capital costs of these improvements. This study included the completion of a full mine ventilation survey as well as measurement of a full suite of electrical parameters of the surface and underground ventilation fans. After these measurements, a base ventilation model was created and established as the system baseline. Changes to the ventilation system were modeled, and their effects on the power demand were projected. The results of the study showed that several improvements were possible which may significantly improve the efficiency of the ventilation system and reduce mine electricity demand.INTRODUCTIONIn 2017, a ventilation study was conducted in accordance with the Independent Electricity System Operator Industrial Accelerator Program (IESO IAP) at a mine in Ontario, Canada. The IESO IAP is designed to assist eligible transmission-connected Canadian companies operating in Ontario to fast track capital investment in major energy conservation projects. The program will provide financial incentives to encourage investment in innovative process changes and equipment retrofits to reduce electricity consumption on the provincial system and to help companies become more competitive by positively impacting their bottom line. There are now four initiatives under the Industrial Accelerator Program:1. Retrofit2. Process & Systems, including Small Capital Projects3. High Performance New Construction4. Energy Managers – a new initiative under the Industrial Accelerator ProgramWithin the program, companies may propose energy saving changes to their current systems where applicable and appropriate. Companies may then be awarded funding to implement the proposed changes. The program allows partial financial compensation to implement certain energy saving changes that would otherwise not be considered due to high capital costs. For larger projects, such as underground mine ventilation systems, a detailed engineering study must be submitted. This study must detail each energy saving change or measure, its savings, and calculate the financial incentives using the IESO IAP Payment Structure. The payment structure for a project is an amount equal to the lowest of the following (Independent Electricity System Operator, 2015):"
Citation
APA:
(2019) An Analysis of a Detailed Engineering Study in Accordance with IESO IAP RequirementsMLA: An Analysis of a Detailed Engineering Study in Accordance with IESO IAP Requirements. Canadian Institute of Mining, Metallurgy and Petroleum, 2019.