An Application Of L-TOPS To Project Evaluation

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 505 KB
- Publication Date:
- Jan 1, 1996
Abstract
Long-Term Open Pit Scheduler or L-TOPS is a new software package for evaluating, planning, and design of open pit mines. L-TOPS transforms geological, economic, and technical information about a mineral deposit into a detailed mining schedule that maximizes economic efficiency without neglecting the practical requirements of mining operations. L-TOPS has been customized for integration with Placer Dome Inc.'s existing in-house resource/reserve optimization software to function as a primary tool for property acquisition studies and for the designing of mines for feasibility studies. This pa-per presents an overview of L-TOPS and reports on its application to Placer Pacific's (Placer Dome's Australian affiliate) Mt. Rawdon project.
Citation
APA:
(1996) An Application Of L-TOPS To Project EvaluationMLA: An Application Of L-TOPS To Project Evaluation. Society for Mining, Metallurgy & Exploration, 1996.