Abstract
This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mitigated using explosives prior to being opened to guests.