An Investigation into Spoil Stability at Moura
 
    
    - Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 701 KB
- Publication Date:
- Jan 1, 1981
Abstract
The sequence of development and back  analysis of the failure of a spoil pile in the  1B pit of the Moura Mine are given. The mode  of failure was a two-wedge mechanism with a  basal slip plane passing through a clay band  about 2 m below the pit floor. Remedial  actions for improving spoil pile stability  are discussed.
Citation
APA: (1981) An Investigation into Spoil Stability at Moura
MLA: An Investigation into Spoil Stability at Moura. The Australasian Institute of Mining and Metallurgy, 1981.
