Andacollo Gold Production – Ahead of Schedule and Under Budget

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 41 KB
- Publication Date:
- Jan 1, 1996
Abstract
The Andacollo gold mine is located near the town of Andacollo (population 14,000 people) in Chile’s region four. It is about 56km (35 miles) by paved road from the coastal city of La Serena. Santiago is about480 km (300 miles) south. Site elevation varies between 1,000 and 1,280 m(3,300 and 4,200 ft). The climate at the Andacollo site is moderate but arid. Average annual rainfall is only 130mm (5 in.). Because there is little rain and the temperature varies only a few degrees (14 to 24 C or 57 to 75F), there are no problems with freezing, solution dilution or pad saturation. The climatic conditions are ideal for heap leaching.
Citation
APA:
(1996) Andacollo Gold Production – Ahead of Schedule and Under BudgetMLA: Andacollo Gold Production – Ahead of Schedule and Under Budget. Society for Mining, Metallurgy & Exploration, 1996.