Andacollo Gold-Production In Sight Ahead Of Schedule And Under Budget

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 633 KB
- Publication Date:
- Jan 1, 1996
Abstract
The Andacollo gold mine is located near the small town of Andacollo, Chile (population 14,000) in the fourth region. It is approximately 35 miles by paved road from the coastal city of La Serena, and Santiago lies about 300 miles to the south (see map.) Site elevation varies between 3300 feet and 4200 feet. The climate at the site is moderate but arid, with an average annual rainfall of only five inches. Because there is little rain, and the temperature varies only a few degrees (57"F to 75°F); there are no freezing, solution dilution, or pad saturation problems. The climatic conditions are ideal for heap leaching.
Citation
APA:
(1996) Andacollo Gold-Production In Sight Ahead Of Schedule And Under BudgetMLA: Andacollo Gold-Production In Sight Ahead Of Schedule And Under Budget. Society for Mining, Metallurgy & Exploration, 1996.