Assessing the Risk of Incorrect Prediction - A Nickel/Cobalt Case Study

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 574 KB
- Publication Date:
- Jan 1, 1998
Abstract
Mine planning requires careful prediction of both the head grade and tonnage of mineralisation. As part of the planning process, operators of the Murrin Murrin nickel/cobalt orebodies (located in the Eastern Goldfields province of the Yilgarn
Citation
APA:
(1998) Assessing the Risk of Incorrect Prediction - A Nickel/Cobalt Case StudyMLA: Assessing the Risk of Incorrect Prediction - A Nickel/Cobalt Case Study. The Australasian Institute of Mining and Metallurgy, 1998.