Atlanta North-South Tunnel

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 320 KB
- Publication Date:
Abstract
The Georgia Department of Transportation (GDOT) undertook an exploratory feasibility study to one of the most ambitious tunneling projects in the United States. HNTB Corporation was retained to perform the study, deemed the Atlanta North-South Tunnel, which is approximately 7 miles long and consisting of four lanes (or six lanes) starting at the southern terminus of SR 400 extending to the south connecting with the northern terminus of I-675, providing substantial relief to the Downtown Connector (I-75/I-85), the most congested portion of Atlanta?s freeway system. This paper summarizes the analysis performed during the first phase of this challenging assignment which, if constructed, would be one of the longest roadway tunnels ever built in the United States.
Citation
APA:
Atlanta North-South TunnelMLA: Atlanta North-South Tunnel. Society for Mining, Metallurgy & Exploration,