Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023

Society for Mining, Metallurgy & Exploration
Walter Klary Dominic Reda Vojtech Gall Elmira Riahi Jake Coibion
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
178 KB
Publication Date:
Jun 13, 2023

Abstract

Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowest price. The delivery method promotes flexibility and collaboration at all levels from the initial design stage through construction. Using the example of the Atlanta Airport Plane Train Tunnel West Extension, value-added risk management was added during the initial design phase with an independent reviewer. This paper presents the independent reviewer transitioning from constructability review in the very early stages of design to independent design verification to on-site supervision during construction.
Citation

APA: Walter Klary Dominic Reda Vojtech Gall Elmira Riahi Jake Coibion  (2023)  Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023

MLA: Walter Klary Dominic Reda Vojtech Gall Elmira Riahi Jake Coibion Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account