Backfill Placement Technique On Vaal Reefs

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 183 KB
- Publication Date:
- Jan 1, 1988
Abstract
The cycloned gravitated tailings backfill system, also referred to as a soft or low density fill, has been implemented at Vaal Reefs. Inhibiting the success of the system was the problem of shrinkage after placement. The problem was overcome by a pressure fill technique which eliminated settlement, contained costs and allowed remote placement. The technique involves the preinstallation of disposable pipes which are filled cyclically until a residual pressure of 0,5 bar of active support is generated in the filled paddock.
Citation
APA:
(1988) Backfill Placement Technique On Vaal ReefsMLA: Backfill Placement Technique On Vaal Reefs. The Southern African Institute of Mining and Metallurgy, 1988.