Bateman Mega DMS Modules- Successes And Challenges - Introduction

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 16
- File Size:
- 747 KB
- Publication Date:
- Jan 1, 2006
Abstract
Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200 tph. The most popular unit produced by Bateman Modular over the years has been the 50 tph module. Development In the last 7 years a need has arisen from the industry to provide Modular DMS plants that can treat higher tonnages (150 to 200 tph). The first DMS provided to the mining industry based on the modular concept was a 150 tph DMS Module to MIBA in the DRC. Since then Bateman Modular has provided some 14 Mega DMS modules over the last 7 years with the latest two orders from Debswana (Damtshaa double up project) and Namdeb. Ever since the first Mega Module was supplied Bateman Modular has been improving the Modules. Implementation The modules can be supplied in different configurations so as to improve the overall availability of the plant. Two off 150 tph DMS modules were supplied for a Transhex operation. This allowed the client to still operate one DMS module while maintenance is being performed on the other DMS module. The client also has the option of choosing a single module. Successes The following list of projects provides the base for the success of the Mega Modules.
Citation
APA:
(2006) Bateman Mega DMS Modules- Successes And Challenges - IntroductionMLA: Bateman Mega DMS Modules- Successes And Challenges - Introduction. The Southern African Institute of Mining and Metallurgy, 2006.