Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis

- Organization:
- Deep Foundations Institute
- Pages:
- 6
- File Size:
- 482 KB
- Publication Date:
- Jan 1, 2010
Abstract
In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a means of saving of piling cost. To satisfy these requirement, a new technique for large diameter bell bottom cast-in-place piling has been developed utilizing multi-head reverse circulation drilling system.
Citation
APA:
(2010) Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? SynopsisMLA: Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis. Deep Foundations Institute, 2010.