Benefits of Early Collaboration Between Designers and Suppliers in Tunnel Design

Society for Mining, Metallurgy & Exploration
Günther M. Volkmann
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
395 KB
Publication Date:
Jan 1, 2008

Abstract

Continuous developments in tunneling require knowledge transfer between designers and suppliers to optimize the application of support systems. This collaboration allows the designer access to the latest research results, technical innovations, and support specific measurement techniques as well as the supplier?s experiences on recent projects. Project specific requirements determine the information that can be used to increase support system efficiency, advance rate, degree of safety, or decrease costs. This cooperative effort results in not only an unambiguous tender document, but also an optimized design with reduced risk that is coordinated with safe and high performance construction techniques. This paper will address the benefits of an early collaboration to both the design and the specifications in the tender document by using the A3 Hindhead project (UK) as an example.
Citation

APA: Günther M. Volkmann  (2008)  Benefits of Early Collaboration Between Designers and Suppliers in Tunnel Design

MLA: Günther M. Volkmann Benefits of Early Collaboration Between Designers and Suppliers in Tunnel Design. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account