Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 1932 KB
- Publication Date:
- Jun 13, 2021
Abstract
The Foothill Tunnel is a remote 16-mile-long untreated drinking water tunnel in the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy Water and Power (HHWP) system. The 14-foot horseshoe shaped tunnel, constructed in the 1920s, is lined intermittently with concrete over approximately 53% of its length, with the balance being unlined rock. After detailed planning, in January of 2020 Mott MacDonald and HHWP staff completed a visual inspection and documented the condition of the tunnel with electronic data collection, photographs, and video with audio recording. The result was a comprehensive condition assessment that identified key areas of the tunnel to monitor.
Citation
APA:
(2021) Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021MLA: Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.