Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 625 KB
- Publication Date:
- Jun 23, 2024
Abstract
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel
corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge
expansions. As part of the design-build contract, a supplemental geotechnical investigation was completed
to support the design. The investigation for the subaqueous tunnel segment consisted of over 48,400 linear
feet of drilling and 7,100 laboratory tests. This paper discusses the challenges of planning and executing a
large-scale geotechnical investigation for underground works in a marine environment and the use of big data
for effectively managing, interpreting, and transmitting data to the design-builder consistently throughout the
investigation.
Citation
APA:
(2024) Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024MLA: Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.