BIM Use in the Infrastructural Field: The Case of the Extension of the Railway in the Underground Track of Catania, From the Central Station F.S. to the Airport

Society for Mining, Metallurgy & Exploration
Luca Schiavinato Stefano Colombelli Gabriele Eccher Domenico Nave Paolo Cucino Nicola Bona
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
883 KB
Publication Date:
Jan 1, 2016

Abstract

"BIM technologies provide tools and processes to effectively support the entire life of an infrastructure, from strategic planning to maintenance. As a consequence, infrastructure design processes currently make frequent use of BIM tools. This paper describes the BIM oriented design of the underground railway extension in the metropolitan area of Catania. The paper highlights the design process and the chosen BIM tools considering the boundary conditions characterizing the project, i.e. basic information missing in the final design project, need of coordination between different design disciplines and designer companies, and, finally, need for a flexible design approach able to adapt to changes occurring during design development. INTRODUCTION The underground railway extension in the metropolitan area of Catania is composed of two lots of approximately two km each, namely “Stesicoro-Aeroporto” and “Nesima –Misterbianco”. Works to be realized are: •,Main tunnel: mechanized tunneling using a TBM-EPB machine, for the entire length of the lot; •,Underground stations: San Domenico, Vittorio Emanuele and Palestro, conventionally excavated as enlargement of the TBM tunnel after the partial demolition of precast segments; •,Ventilation and emergency shafts: connecting seven tunnel levels to road level on Stesicoro-Areaposto lot, six on Nesima-Misterbianco lot; •,Additional structures such as technical rooms and parking lot; •,Electric Substation at Monte Po' stop; •,Temporary works: TBM launching and arrival pit to be dismantled at the end of the works."
Citation

APA: Luca Schiavinato Stefano Colombelli Gabriele Eccher Domenico Nave Paolo Cucino Nicola Bona  (2016)  BIM Use in the Infrastructural Field: The Case of the Extension of the Railway in the Underground Track of Catania, From the Central Station F.S. to the Airport

MLA: Luca Schiavinato Stefano Colombelli Gabriele Eccher Domenico Nave Paolo Cucino Nicola Bona BIM Use in the Infrastructural Field: The Case of the Extension of the Railway in the Underground Track of Catania, From the Central Station F.S. to the Airport. Society for Mining, Metallurgy & Exploration, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account