Budget Model Data of Drill and Blast Tunnelling in Brazil

- Organization:
- International Society of Explosives Engineers
- Pages:
- 8
- File Size:
- 1986 KB
- Publication Date:
- Jan 1, 2016
Abstract
"This article presents data of advance and excavation rates in tunnelling works, and how theseactivities interact with the duration and cost of a contract. These key parameters, after analysis andsynthesis, will be used in coming works to ensure the evolution and adaptation of the method created by the Norwegian University of Science and Technology - the NTNU Method - to Brazilianconditions, which will be reflected in the duration and cost of underground drill and blast tunnellingworks."