Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

International Society of Explosives Engineers
David Harrison Brian Harrison
Organization:
International Society of Explosives Engineers
Pages:
9
File Size:
3677 KB
Publication Date:
Jan 1, 2018

Abstract

The Army Corps of Engineers completed the Charleroi Lock and Dam in 1932. It is located on the Monongahela river approximately 22 miles (35k) south of Pittsburgh in Charleroi, Pennsylvania. It is comprised of a 420-foot (128m) gated dam, and a 720-foot (219m) by 56-foot (17m) land side lock, which provides for a 16.6 foot (5m) vertical lift.
Citation

APA: David Harrison Brian Harrison  (2018)  Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

MLA: David Harrison Brian Harrison Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2. International Society of Explosives Engineers, 2018.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account