Cleaning Hartford waterways through underground storage

Society for Mining, Metallurgy & Exploration
Verya Nasria William Bent William Hogan
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
7
File Size:
3298 KB
Publication Date:
Jan 1, 2014

Abstract

"The South Hartford Conveyance and Storage Tunnel (SHCST) project is a significant component of the Hartford Metropolitan District’s (MDC) long-term control plan (LTCP), which is overseen by the Connecticut Department of Energy and Environmental Protection (CTDEEP). This project will address a portion of the MDC’s Clean Water Project (CWP), which will reduce combined sewer overflows (CSOs), eliminate sanitary sewer overflows (SSOs), and reduce nitrogen released into the Connecticut River. The purpose of the SHCST project is to eliminate West Hartford and Newington SSOs, eliminate Franklin area CSOs discharging to Wethersfield Cove and minimize CSO discharges to the South Branch Park River. The locations of each overflow are shown in Fig. 1. In 2010, the district prepared a preliminary design report (PDR) for the SHCST project, which included relief of the Folly Brook trunk sewer and proposed to keep the tunnel boring machine (TBM) retrieval shaft within the city limits of Hartford. Figure 1 shows the 2010 PDR recommended tunnel route. Subsequent to the PDR, the objectives of the SHCST have slightly shifted. In accordance with ongoing revisions to the LTCP, relief of the Folly Brook Trunk Sewer is no longer necessary. Additionally, the MDC has decided to perform less sewer separation in the Franklin Avenue drainage area. To replace the sewer separation, new relief points are proposed within the Franklin area and will be diverted to the SHCST. Figure 1 also shows the current recommended tunnel route (Alignment F). During 2012, the MDC conducted an evaluation of the potential of connecting the proposed North Tunnel (originally proposed as an independent tunnel with its own pump station) into the South Hartford Conveyance and Storage Tunnel. This evaluation concluded that the two proposed tunnels could reasonably be connected together and operated as a single tunnel system utilizing the tunnel pump station at the eastern terminus of the South Hartford Tunnel (Fig. 2). It also was concluded that this alternative was less costly than two independent tunnel systems."
Citation

APA: Verya Nasria William Bent William Hogan  (2014)  Cleaning Hartford waterways through underground storage

MLA: Verya Nasria William Bent William Hogan Cleaning Hartford waterways through underground storage. Society for Mining, Metallurgy & Exploration, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account