Comparative Resource Studies in an Open-Pit-Blased Estimates

The Australasian Institute of Mining and Metallurgy
T QUINLAN
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
563 KB
Publication Date:
Jan 1, 1992

Abstract

A resource estimate uses data obtained by sampling an orebody. An example is described in which a random drilling pattern did not provide a representative set of assays, and the estimated resource was significantly less than the mine production. It is believed that a better estimate would have been made if the exploration holes had been drilled on a regular grid.
Citation

APA: T QUINLAN  (1992)  Comparative Resource Studies in an Open-Pit-Blased Estimates

MLA: T QUINLAN Comparative Resource Studies in an Open-Pit-Blased Estimates. The Australasian Institute of Mining and Metallurgy, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account