Computer Simulation Of Long Range Ore Grade Control At Matsumine Kuroko Mine

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Y. Watanabe S. Ito
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
14
File Size:
379 KB
Publication Date:
Jan 1, 1976

Abstract

In the long range production planning at the Matsumine mine, a management target is to maintain a desired production rate and to keep fluctuations in copper and zinc grades within given allowable limits. A simulation model was developed to find, on a trial and error basis, how feasible and practical the target may be under certain constraints on the underground mining sequence. A number of simulation runs have been made to obtain the most suitable production rate for the long term. In this paper, an outline of the simulation model is described.
Citation

APA: Y. Watanabe S. Ito  (1976)  Computer Simulation Of Long Range Ore Grade Control At Matsumine Kuroko Mine

MLA: Y. Watanabe S. Ito Computer Simulation Of Long Range Ore Grade Control At Matsumine Kuroko Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account