Computer Simulation Of Long Range Ore Grade Control At Matsumine Kuroko Mine

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 14
- File Size:
- 379 KB
- Publication Date:
- Jan 1, 1976
Abstract
In the long range production planning at the Matsumine mine, a management target is to maintain a desired production rate and to keep fluctuations in copper and zinc grades within given allowable limits. A simulation model was developed to find, on a trial and error basis, how feasible and practical the target may be under certain constraints on the underground mining sequence. A number of simulation runs have been made to obtain the most suitable production rate for the long term. In this paper, an outline of the simulation model is described.
Citation
APA:
(1976) Computer Simulation Of Long Range Ore Grade Control At Matsumine Kuroko MineMLA: Computer Simulation Of Long Range Ore Grade Control At Matsumine Kuroko Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1976.