Concentrating Process Control at Reserve Mining Company ( SEPTEMBER 1983 MINING ENGINEERING)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
R. N. Schulz
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
7
File Size:
518 KB
Publication Date:
Jan 1, 1984

Abstract

The recently completed modifications and additions to Reserve Mining Company's taconite concentrating process incorporate a totally new control system. Design of the new control scheme is centered on reliability, versatility, centralization, and optimization. The design objectives were achieved through a distributed control system based on a network of independent field located microprocessor based control system connected to a central control room. Operation of each micro-processors can be interrogated and modified from the central control room by the operator or by either of two computer systems. The two computer systems handle logging, alarming, specialized sequenced controls, and complex process optimization routines.
Citation

APA: R. N. Schulz  (1984)  Concentrating Process Control at Reserve Mining Company ( SEPTEMBER 1983 MINING ENGINEERING)

MLA: R. N. Schulz Concentrating Process Control at Reserve Mining Company ( SEPTEMBER 1983 MINING ENGINEERING). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account