Construction and Testing of Very Large Diameter Drilled Shafts for Abernethy Bridge

Deep Foundations Institute
Mike Muchard Peter Faust
Organization:
Deep Foundations Institute
Pages:
7
File Size:
2701 KB
Publication Date:
Jan 1, 2025

Abstract

The I-205 improvements in Oregon include the seismic retrofit and widening of the Abernethy Bridge to withstand major earthquakes. When completed it will be the first earthquake-ready bridge that crosses the Willamette River in the Portland metropolitan area; establishing it as the regional north-south lifeline route after a disaster. To meet seismic performance goals, critical bridge piers were retrofitted with very large and deep nonredundant (single) drilled shafts with "outrigger" bents. New drilled shafts and columns were constructed on both sides of these piers supporting a new post tensioned "super beam." While the drHled shaft scope of the project is now finished, construction is still underway for the project, which is due for completion in 2025. Once the load is transferred to the new outrigger bents, the existing columns will be removed. Drilled shaft diameters for the river crossing ranged from 8.2-12.25 ft (2.5-3.7 m), with the largest shafts extending over 240 ft (73 m) in length. This size drilled shaft surpasses the typical dimensions used for transportation structures. Given the enormity of these shafts, combined with the complex geology and site constraints, the Oregon Department of Transportation required a prequalification process to select the foundation contractor, Malcolm Drilling.
Citation

APA: Mike Muchard Peter Faust  (2025)  Construction and Testing of Very Large Diameter Drilled Shafts for Abernethy Bridge

MLA: Mike Muchard Peter Faust Construction and Testing of Very Large Diameter Drilled Shafts for Abernethy Bridge. Deep Foundations Institute, 2025.