Construction of a Large Scale Highway Tunnel by Jacking Methods

The Australasian Institute of Mining and Metallurgy
Nelson G
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
641 KB
Publication Date:
Jan 1, 1993

Abstract

The construction and placement of tunnels by means of jacking is continually advancing. This paper presents an outline of the construction of a major highway tunnel placed by a combination of mining and progressive placement by hydraulic jacking of precast units. Features of the project were the relatively shallow ground cover between rail and road routes over the tunnelling and jacking operations and also the weight of tunnel sections to be moved into position.
Citation

APA: Nelson G  (1993)  Construction of a Large Scale Highway Tunnel by Jacking Methods

MLA: Nelson G Construction of a Large Scale Highway Tunnel by Jacking Methods. The Australasian Institute of Mining and Metallurgy, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account