Abstract

"In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-and-cover enlargement method in sedimentary soft rock. Before and during the construction work, preliminary analysis, in-situ investigations and laboratory tests were conducted to ensure the construction safety and to evaluate the deformation characteristics of sedimentary soft rock. The construction project was safely executed without any water leakage or collapse of tunnel working face. The predicted results from preliminary analysis were almost similar to the measured values. From the detailed investigation of measured results, it was confirmed that the deformation characteristic of the sedimentary soft rock was observed to a small extent as the ground deformation derived from construction work. INTRODUCTION In recent years, some newly constructed urban expressways in Japan are being planned as underground structures due to the consideration of roadside environment. The construction of such underground expressways is frequently conducted using a shield tunneling, a typical one of non-cut-and-cover methods, to prevent any adverse effect to traffic in arterial roads, operation of nearby commercial establishments, and daily lives of local residents during construction work. For underground urban expressway, the connections with existing road network on ground surface or on elevated sections are indispensable, which require the construction of an underground branch junction with large cross-section. This raises a technical difficulty regardless of the open-cut or non-open-cut construction method."
Citation

APA: Kenji Namikawa Yoshihiro Terashima Takahiro Inoue Junichi Koseki Yukika Miyashita Masashi Matsumoto  (2016)  Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft Rock

MLA: Kenji Namikawa Yoshihiro Terashima Takahiro Inoue Junichi Koseki Yukika Miyashita Masashi Matsumoto Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft Rock. Society for Mining, Metallurgy & Exploration, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account