Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 20
- File Size:
- 1353 KB
- Publication Date:
- Jan 1, 1989
Abstract
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two contracts consist of 791 m (4.22 miles) of 3.5 m (11.5 ft) tunnel lined to 2.9 m (9.5 ft), nine access shafts, six drop shafts, and six collection structures. The excavation drive was completed by the use of a 1970 vintage Robbins TBM hybrid for this particular job through the use of both new and old technology. All other excavations were successfully accomplished through drill and blast method in tight residential areas. Concrete lining and connections were completed nine months after holing through.
Citation
APA:
(1989) Construction Of Southwest Interceptor #3 And #4 Cleveland, OhioMLA: Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio. Society for Mining, Metallurgy & Exploration, 1989.