Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 20
- File Size:
- 1273 KB
- Publication Date:
- Jan 1, 1995
Abstract
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest quadrant of the 86.9 km (54 mile) long main collider ring. The contract required the excavation and initial support of a 54.3 m (178 vlf) deep ventilation shaft, a connecting horseshoe shaped Adit and TBM starter tunnel and 3,865 m (12,680 If) long main collider tunnel with a 4.3 m (14 ft) minimum finished diameter. This paper discusses the construction methods, equipment utilized and the production achieved in the construction of the ventilation shaft, connecting adits and the main collider tunnel.
Citation
APA:
(1995) Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]MLA: Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]. Society for Mining, Metallurgy & Exploration, 1995.