Contemporary Criteria of Open Pit Long-Term Production Scheduling

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
21
File Size:
964 KB
Publication Date:
Sep 26, 2011

Abstract

Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with economic criteria such as net present value (NPV), discounted cash flow rate of return (DCFROR) and payback period, which are not sufficient on their own for revealing the complex picture of the decision-making process.This paper offers a thorough analysis of the most important contemporary criteria of long-term production scheduling, as way to provide the mining practice with a new approach to the decision-making process. The list of criteria includes technological, economic and probabilistic ones. A detailed case study is provided aiming to illustrate the applicability of the criteria for comparing the scheduling approaches regarding the economic interests of a mineÆs owner and contractor. The results obtained can be used for revealing new trends in the current methodology of open-pit production scheduling optimisations.
Citation

APA:  (2011)  Contemporary Criteria of Open Pit Long-Term Production Scheduling

MLA: Contemporary Criteria of Open Pit Long-Term Production Scheduling. The Australasian Institute of Mining and Metallurgy, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account