Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 1294 KB
- Publication Date:
- Jan 1, 2013
Abstract
The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization of these sites. On the one hand, for founding new industrial and commercial facilities and on the other hand for touristic activities.
Citation
APA:
(2013) Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic DetonatorsMLA: Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators. International Society of Explosives Engineers, 2013.