Cost of Reclamation and Mine Drainage Abatement, Elkins Demonstration Project (TRANSACTIONS - VOL. 252 )

The American Institute of Mining, Metallurgical, and Petroleum Engineers
R. B. Scott R. D. Hill R. C. Wilmoth
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
7
File Size:
548 KB
Publication Date:
Jan 1, 1973

Abstract

A cost breakdown is given for reclamation and mine drainage abatement conducted by the Federal Water Quality Administration's demonstration project near Elkins, W. Va. Costs for construction of control measures have been developed and include backfilling strip mines, sealing subsidence areas, reconstructing stream channels, and installing mine seals to prevent the entrance of water and air.
Citation

APA: R. B. Scott R. D. Hill R. C. Wilmoth  (1973)  Cost of Reclamation and Mine Drainage Abatement, Elkins Demonstration Project (TRANSACTIONS - VOL. 252 )

MLA: R. B. Scott R. D. Hill R. C. Wilmoth Cost of Reclamation and Mine Drainage Abatement, Elkins Demonstration Project (TRANSACTIONS - VOL. 252 ). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1973.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account