Cost of Reclamation and Mine Drainage Abatement, Elkins Demonstration Project (TRANSACTIONS - VOL. 252 )

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 7
- File Size:
- 548 KB
- Publication Date:
- Jan 1, 1973
Abstract
A cost breakdown is given for reclamation and mine drainage abatement conducted by the Federal Water Quality Administration's demonstration project near Elkins, W. Va. Costs for construction of control measures have been developed and include backfilling strip mines, sealing subsidence areas, reconstructing stream channels, and installing mine seals to prevent the entrance of water and air.
Citation
APA:
(1973) Cost of Reclamation and Mine Drainage Abatement, Elkins Demonstration Project (TRANSACTIONS - VOL. 252 )MLA: Cost of Reclamation and Mine Drainage Abatement, Elkins Demonstration Project (TRANSACTIONS - VOL. 252 ). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1973.