Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 2802 KB
- Publication Date:
- Jan 1, 2003
Abstract
In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial and sandstone deposits for the conversion of the existing LEP underground laboratory at CERN, Geneva adjacent to the Jura Mountains/Lake Geneva had to be undertaken in an operational environment and in conjunction with other underground constructions associated with the US$3bn refurbishment.