Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland

Society for Mining, Metallurgy & Exploration
Keith Jones Martin Knights Timothy Watson
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
2802 KB
Publication Date:
Jan 1, 2003

Abstract

In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial and sandstone deposits for the conversion of the existing LEP underground laboratory at CERN, Geneva adjacent to the Jura Mountains/Lake Geneva had to be undertaken in an operational environment and in conjunction with other underground constructions associated with the US$3bn refurbishment.
Citation

APA: Keith Jones Martin Knights Timothy Watson  (2003)  Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland

MLA: Keith Jones Martin Knights Timothy Watson Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland. Society for Mining, Metallurgy & Exploration, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account