Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

Society for Mining, Metallurgy & Exploration
D. Tepavac Y. Sun M. Trim A. Kumar
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
16
File Size:
6733 KB
Publication Date:
Dec 1, 2022

Abstract

Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuses on the technical challenges of designing these caverns within a heterogeneous, generally weak sandstone under highstress conditions while providing a construction sequence that would align with the contractor’s preferred techniques and schedule. Various construction techniques were investigated, but ultimately an observational approach relying on a construction sequence and specialized instrumentation met both the designer’s and contractor’s requirements. Relevant data obtained from excavations and the construction monitoring program are presented within.
Citation

APA: D. Tepavac Y. Sun M. Trim A. Kumar  (2022)  Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

MLA: D. Tepavac Y. Sun M. Trim A. Kumar Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account