Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

Deep Foundations Institute
James M. Tantalla Roderic A. Ellman Jr. Dwight Metcalf
Organization:
Deep Foundations Institute
Pages:
10
File Size:
1507 KB
Publication Date:
Jan 1, 2016

Abstract

"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150 feet below the Ohio River levels. The new plant, which generates about 390 GWh of electricity annually, is owned by American Municipal Power (AMP). A specialist team was assembled to design and construct the cofferdam, marine dike and CB slurry wall that helped make the project successful and on time for project delivery.Because the new plant diverts water from the locks and dam through a powerhouse to generate power, it would need to be partially in the river to operate properly. To accomplish this, approximately 250,000 square feet of land was reclaimed from the river by construction of a marine dike. The dike, combined with the design and construction of a 150 foot deep cement bentonite (CB) cutoff wall enabled construction of the new plant in the dry. Extensive dewatering analyses were performed using Modflow to evaluate pumping requirements and the number of wells needed to maintain ground water at required levels within the side slopes and final subgrade. A monitoring program consisting of inclinometers, piezometers and movement monitoring points were used to monitor cofferdam stability and performance throughout construction. Detailed two and three dimensional stability analyses that included a parametric study of fluctuating river levels and slurry unit weight were performed to ensure stability and suitable low permeability of the trench during cut-off wall excavation both on land and in the marine dike. The wall was constructed with both a hydromill excavating primary panels and a clamshell following behind to construct secondary panels. Data acquisition systems onboard the excavating equipment allowed for detailed confirmation of the continuity of the wall at each interface between panels. Another challenging aspect was the CB mix design for the trench. The cofferdam required the construction of a 1,300-foot long marine dike downstream of the existing dam up to 100 feet tall founded on existing river sediment to enclose the site and cut-off the seepage into the excavation from the river. Marine dike construction utilized vibro-compaction to pre-densify granular fills placed underwater through which the CB trench extended."
Citation

APA: James M. Tantalla Roderic A. Ellman Jr. Dwight Metcalf  (2016)  Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

MLA: James M. Tantalla Roderic A. Ellman Jr. Dwight Metcalf Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall. Deep Foundations Institute, 2016.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account