Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

Society for Mining, Metallurgy & Exploration
Andrew Raine Abegail Endraca Allan Patdu Allan Sebastian
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
19
File Size:
365 KB
Publication Date:
Jun 13, 2023

Abstract

The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km long and 3.1 m internal diameter tunnel that can deliver up to 1,000 MLD of raw water and the tunnel passes under urban residential and urban populated areas adjacent to and along Commonwealth Avenue. A new reservoir intake structure was constructed in the La Mesa reservoir by a cofferdam and the TBM breakthrough connected the reservoir to the outlet surge shaft structure and the downstream pipe network system connecting to the Balara Water Treatment Plant. The TBM incorporated a double articulated head configuration to allow tight 80 m radius curves to navigate some of the difficult alignment considerations. The alignment passed very close to some existing foundations for MRT7 and needed to clear several tight curves to remain within government land ownership. The project excavated through the local Guadalupe weak rock formations and there was minimal ground movements observed as a result of the work.
Citation

APA: Andrew Raine Abegail Endraca Allan Patdu Allan Sebastian  (2023)  Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

MLA: Andrew Raine Abegail Endraca Allan Patdu Allan Sebastian Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account