Design and Construction of the Weehawken Tunnel and Bergenline Avenue Station

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 2892 KB
- Publication Date:
- Jan 1, 2003
Abstract
This paper discusses design and construction aspects of the tunnel, shaft and station for the Weehawken Tunnel and Bergen line Avenue Station. The project consists of a 1,269 m (4,156 ft) long existing railroad tunnel, which will be enlarged and equipped with a two-track light rail system. The project also includes construction of a deep underground station, with a large shaft connecting the surface station to the below ground station for access and ventilation purposes. Vibration and noise from blasting is a critical community issue and blasting adjacent to two 230-kV duct banks located in the tunnel invert required special blasting procedures.
Citation
APA:
(2003) Design and Construction of the Weehawken Tunnel and Bergenline Avenue StationMLA: Design and Construction of the Weehawken Tunnel and Bergenline Avenue Station. Society for Mining, Metallurgy & Exploration, 2003.