Design Aspects of the Minneapolis Central City Parallel Tunnel - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 17
- File Size:
- 241 KB
- Publication Date:
- Jun 13, 2023
Abstract
The existing Central City Tunnel was built primarily in the 1930s with a small portion as
old as the 1880s. It conveys stormwater in downtown Minneapolis. It is a 4,400-ft long
tunnel located 80 feet underground. The Central City Tunnel has experienced surcharging
and surface overflows during heavy rainfall events. This paper presents the
details of tunnel and shaft design for the new Central City Parallel Tunnel to mitigate
the overflows. The design considered hydraulics and geotechnical engineering for the
structural geologic conditions including the weak Saint Peter Sandstone and overlying
strong Platteville Limestone. Ground conditions resulted in tunnel designs including
large flat-back box tunnels and unique cathedral-shaped tunnel sections.
Citation
APA:
(2023) Design Aspects of the Minneapolis Central City Parallel Tunnel - RETC2023MLA: Design Aspects of the Minneapolis Central City Parallel Tunnel - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.