Design-Build: Elevating Partnering to a Higher Level

Society for Mining, Metallurgy & Exploration
H. Lee Wimmer I. Michael Gowring Curtis A. Pledger
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
1706 KB
Publication Date:
Jan 1, 2003

Abstract

The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value Engineering team proposed a single-tunnel alignment that would be less destructive on the environment and might have a lower life cycle cost than the proposed design of two tunnels connected by two pipelines on steep hillsides. A decision was made to include this option in the bid process as a design-build alternative. The bid for this option was the lowest and a contract was awarded. During the TBM excavation a segment of tunnel wall caved in containing large quantities of water saturated with extremely high levels of hydrogen sul?de (H2S)gas (measured at 380 to 520 ppm in the air). The Central Utah Water Conservancy District (District) in consultation with Obayashi/Clyde (Contractor) quickly developed anew plan to finish the system by incorporating parts of the original tunnel/pipeline concept and re-bid the remainder of the project as a Phase 2 Design-Build contract.
Citation

APA: H. Lee Wimmer I. Michael Gowring Curtis A. Pledger  (2003)  Design-Build: Elevating Partnering to a Higher Level

MLA: H. Lee Wimmer I. Michael Gowring Curtis A. Pledger Design-Build: Elevating Partnering to a Higher Level. Society for Mining, Metallurgy & Exploration, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account