Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 1995 KB
- Publication Date:
- Jan 1, 2003
Abstract
This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River as well as provides long needed relief from flooding problems in the southeastern portion of the Interstate 25 highway corridor. The Outfall tunnel incorporates a one-pass precast concrete segmented liner to convey storm water under I-25 then under Mississippi Avenue to the river. The Outfall crosses both the existing I-25 as well as the future improvements including under the Light Rail Transit, a new bridge abutment, widened lanes, and new retaining walls. The Outfall also crosses adjacent to several buildings and five bridges, under major traffic and utility intersections, and through difficult geology.
Citation
APA:
(2003) Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex ProjectMLA: Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project. Society for Mining, Metallurgy & Exploration, 2003.