Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

Society for Mining, Metallurgy & Exploration
Kathryn Kelly Julian Prada Todd Moline Robin Dill Brian Hann
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
174 KB
Publication Date:
Jun 13, 2023

Abstract

Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump-sum, design-build that led NBC to select it as the project delivery method. The use of a design-build contracting process that included proprietary meetings to discuss and obtain feedback on Alternative Technical Concepts as well as to facilitate reaching consensus on modifications to the GBR-B is also described. The discussion includes features and benefits of design-build process that not only addressed NBC’s desired outcomes, but also allowed the Design-Builder to propose several innovative changes to the Base Technical Concepts included in the bid documents, and to develop a GBR-C that was compatible with their proposed means and methods of construction and addressed what they believed to be the more significant subsurface risks on the project.
Citation

APA: Kathryn Kelly Julian Prada Todd Moline Robin Dill Brian Hann  (2023)  Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

MLA: Kathryn Kelly Julian Prada Todd Moline Robin Dill Brian Hann Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account