Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

Society for Mining, Metallurgy & Exploration
James Parkes Aaron Archer
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
5952 KB
Publication Date:
Jun 13, 2021

Abstract

This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum 10-ft OD intake tunnel; a suction chamber with 6 Pump Shafts; a 30-ft diameter, 300-ft deep Main Shaft; a 2,600 LF Transmission Tunnel with 78-inch steel liner; and a 130-ft deep shaft on the Transmission Tunnel. The tunnels and shafts will be excavated through the Glen Rose limestone. The design development included consideration for technical requirements, easements, third party commitments, previous local project experience, and constructability based on contractor outreach.
Citation

APA: James Parkes Aaron Archer  (2021)  Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

MLA: James Parkes Aaron Archer Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account