Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 5952 KB
- Publication Date:
- Jun 13, 2021
Abstract
This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum 10-ft OD intake tunnel; a suction chamber with 6 Pump Shafts; a 30-ft diameter, 300-ft deep Main Shaft; a 2,600 LF Transmission Tunnel with 78-inch steel liner; and a 130-ft deep shaft on the Transmission Tunnel. The tunnels and shafts will be excavated through the Glen Rose limestone. The design development included consideration for technical requirements, easements, third party commitments, previous local project experience, and constructability based on contractor outreach.
Citation
APA:
(2021) Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021MLA: Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.