Design Evaluations for the San Vicente Pipeline Tunnel

Society for Mining, Metallurgy & Exploration
Steve Klein Dave Hopkins Mike McRae Zach Ahinga
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
1034 KB
Publication Date:
Jan 1, 2005

Abstract

The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variable geologic conditions consisting of strong granitic and metamorphic rocks, weak sedimentary rocks, abrasive conglomerates, and mixed face conditions. This paper discusses the challenging geologic conditions and some of the key design evaluations for the project. Currently design work for the project has been completed and construction will be underway by mid-2005.
Citation

APA: Steve Klein Dave Hopkins Mike McRae Zach Ahinga  (2005)  Design Evaluations for the San Vicente Pipeline Tunnel

MLA: Steve Klein Dave Hopkins Mike McRae Zach Ahinga Design Evaluations for the San Vicente Pipeline Tunnel. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account