Design Evaluations for the San Vicente Pipeline Tunnel

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 1034 KB
- Publication Date:
- Jan 1, 2005
Abstract
The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variable geologic conditions consisting of strong granitic and metamorphic rocks, weak sedimentary rocks, abrasive conglomerates, and mixed face conditions. This paper discusses the challenging geologic conditions and some of the key design evaluations for the project. Currently design work for the project has been completed and construction will be underway by mid-2005.
Citation
APA:
(2005) Design Evaluations for the San Vicente Pipeline TunnelMLA: Design Evaluations for the San Vicente Pipeline Tunnel. Society for Mining, Metallurgy & Exploration, 2005.